Construction Period: 2004-2006
Project Description: Project Management
Jinping Grade II hydropower plant is located at the main stream of Ya Long River, within Yi Autonomous Region of  Sichuan Province. It is one of the five HEPP power plants at the Ya Long River (Kala to Jiangkou). From 2004 to 2006, AMCC was the consulting Engineer for the two auxiliary tun-nels at the east section, total length approx.18 km.