Home ÖÐÎÄ
Draeger Shanghai Medical System New Facility Phase II project
Draeger Shanghai Medical System New Facility Phase II project
Construction: 2012.7-2013.11
Location: Shanghai China
Gross Floor Area: 18,800m2
Description:  Design and Build
The project is a four-level RC structure building consisting of production halls, R&D lads and offices. The total floor area is 18,800m2 with a footprint of 4,500m2. 50m long piles were designed to avoid structural settlement.
Back

Head Office£º
Unit 1080 Beijing Sunflower Tower 37 Maizidian Street Zhaoyang District Beijing 100125 P.R. of China ¡¡
Tel£º+86 10 8527 5116¡¡¡¡ Fax£º+86 10 8527 5123
E-mail£ºalpine@amc-constr.com.cn111
ZECH GROUP LINK£º
Copyright © ALPINE Mayreder Construction Co., Ltd. (AMCC)¡¡   Imprint |¡¡Privacy