Home ÖÐÎÄ
INERGY Automatic System,Wuhan
INERGY Automatic System,Wuhan
Construction Period: 2006-2007
Location: Wuhan Hubei Province China
Gross Floor Area: 4,600m2
Description: Design and Build
The project is located in Wuhan East Lake High-Tech development Zone, including:
 - Production factory ¨C single level, steel structure,3,800 m2;
 - Office building-one storey, RC structure, 540 m2;
 - Utilities rooms- 200 m2
Total floor area is 4,540 m2
Back

Head Office£º
Unit 1080 Beijing Sunflower Tower 37 Maizidian Street Zhaoyang District Beijing 100125 P.R. of China ¡¡
Tel£º+86 10 8527 5116¡¡¡¡ Fax£º+86 10 8527 5123
E-mail£ºalpine@amc-constr.com.cn111
ZECH GROUP LINK£º
Copyright © ALPINE Mayreder Construction Co., Ltd. (AMCC)¡¡   Imprint |¡¡Privacy