Home ÖÐÎÄ
Haefele Hardware Factory, Beijing
Haefele Hardware Factory, Beijing
Construction Period: 2003-2004
Location: Beijing Cnina
Gross Floor Area: 9,500m2
Description: General Contractor
Office building, workshop and warehouse with total floor area approx. 10,000 m2, located in Beijing Airport Development Zone. Designed by German architect and satisfying German standards of project and energy saving in regard to building envelope, façade, roof and M+E works.
Back

Head Office£º
Unit 1080 Beijing Sunflower Tower 37 Maizidian Street Zhaoyang District Beijing 100125 P.R. of China ¡¡
Tel£º+86 10 8527 5116¡¡¡¡ Fax£º+86 10 8527 5123
E-mail£ºalpine@amc-constr.com.cn111
ZECH GROUP LINK£º
Copyright © ALPINE Mayreder Construction Co., Ltd. (AMCC)¡¡   Imprint |¡¡Privacy