|
Haefele Hardware Factory, Beijing |
Haefele Hardware Factory, Beijing
Construction Period: 2003-2004
Location: Beijing Cnina
Gross Floor Area: 9,500m2
Description: General Contractor
Office building, workshop and warehouse with total floor area approx. 10,000 m2, located in Beijing Airport Development Zone. Designed by German architect and satisfying German standards of project and energy saving in regard to building envelope, façade, roof and M+E works. |
Back |
|
|