|
Bank of China Headquarters Beijing |
Bank of China Headquarters Beijing
Construction Period: 1997-2000
Location: Beijing China
Gross Floor Area: 35,000m2
Description: Design, construction and installation of the glass and aluminum skylight and façade works.
Skylight comprising of 17 interconnected pyramids each 13x13m with span over 52m. |
Back |
|
|